installation et maintenance scénique materiel

MOBILE STEEL BAND LINE SHAFT HOIST

  • High operation speed: 0.1 m/s to 1.5 m/s
  • Max payload 300 daN to 1 500 daN
  • Lifting by steel bands
  • Compact system, thus possible to install 4 battens per metre
  • No extension of the steel bands
  • No deflection
  • Reduced swaying of the battens
  • Simplified faux-gril as no horizontal forces
  • Bands rolled up silently

Option

  • Variable speed
  • Safety brake at the end of the cam line
  • Altitude positioning
  • Over/under load detectors
  • Weight measuring
  • Over-speed detection

Variation

  • Hoist integrated to aluminium truss